Zealcon erected 100 meter steel stack at Byco Refinery

  • 11 years ago
Zealcon Engineering (Pvt.) Ltd erected tallest steel stack of 320 ft height with 600 ton crawler crane and Fabrication and Erection of Flue Gas Stack (97.5 M High) at Byco Refinery.

Recommended