Shore spillway

  • 5 лет назад
The shore spillway of the Sayano-Shushenskaya HPP. The function of the five-stage cascade is to extinguish the energy of the flow-the maximum speed at the entrance to the upper part of the cascade reaches 30 m/s, at the border with the river bed is reduced to 4-5 m/s.

Category

😹
Юмор

Рекомендуем