The Temple will open its doors just in time for St Patrick's Day
Category
🗞
NewsTranscript
00:00Hey guys Leona here bringing you back another exciting update from the Temple
00:04Doncaster. We're back from our holidays and ready to rumble. This week's been a
00:08scary one as we've had some problems with dry rot but rest assured guys
00:12problem solved and it is now all been cleared and boarded back up. This week
00:16I've taken a trip to MB Interiors to have a look at our wall panelling. Hello
00:20Martin. The guys have done an absolutely fantastic job. The wall panelling is now
00:25getting fitted and it looks absolutely beautiful. Take a look at that. Hi George.
00:32Here comes my next culprit Champagne Wayne and this week we've been
00:37determining the colour for the outside of the building. A few swatches have been
00:41applied to the outside of the building to determine that deep dark Irish green.
00:45Next up a trip to Visual Group to see the guys who are designing our signs.
00:49Plans in place it's time to get these bad boys printed. The joiners have been
00:53hard at work building our staff room and office. Here's me doing a little demo of
00:57some typing. Then I made a trip to the print shop to get all of our photos
01:00ready for the walls. Finally you can see that our bar has now been installed. Look
01:05at that it looks absolutely amazing. A little bit of a catwalk. As for the
01:10rooftop that's pretty much finished we just need some furniture up there ready
01:13to go. Six weeks I repeat six weeks people the
01:17countdown is on. Get the date in your diaries it's time to go.