Installation de la grue qui va déposer la passerelle des Rocs

  • il y a 12 ans
Installation de la grue qui va déposer la passerelle des Rocs

Category

🗞
News
Transcription
00:00A few hours later...
00:25The crane behind us is a crane
00:28of a German breeder who rents it to his colleague Sarins,
00:33a Belgian breeder who works as a subcontractor
00:37on this site for all the breeding operations.
00:40It is a large crane with a capacity of 1,200 tons of breeding per foot.
00:45Here it will lift loads of 270 tons
00:48corresponding to the work of the former rock bridge behind us.
00:52These operations will take place on Thursday nights to Friday,
00:55Friday to Saturday and Saturday to Sunday.
01:09It is a crane with a capacity of 1,200 tons per foot.
01:13Here it will take a little less heavy loads.
01:16It is equipped on this site with an arrow of 76 meters in length
01:21to reach the central pier in the middle of the railways.
01:24It is also equipped with an arrow up to 200 meters in height
01:27to lift wind turbines.
01:30It is a totally hydraulic crane
01:33powered by two 430-horsepower diesel engines,
01:36two beautiful Italian cars.

Recommandations